Botswana Solar + BESS

A utility-scale solar and battery storage development platform designed to support industrial demand, grid reliability and future regional energy supply.

DevelopmentPhased development · Botswana

Project overview

A utility-scale solar and battery storage development platform designed to support industrial demand, grid reliability and future regional energy supply.

Development parameterValueBasis
Solar capacity400–450 MWpTarget
Annual solar generation800 GWhTarget
Initial storage power100 MWTarget
Initial battery storage400 MWhTarget

Technical parameters

PV configurationSingle-axis tracking; subject to detailed engineering
Storage configurationInitial four-hour design; modular expansion under evaluation
Solar resourceDesign assumptions require independent yield assessment
Grid strategyDomestic industrial demand and regional interconnection

Development timeline

Indicative development gates. Dates will be published as schedules are verified and approved.

01 · Resource assessment02 · Grid studies & feasibility03 · Permitting & offtake04 · Financing05 · EPC procurement06 · Construction & commissioning

Integration with the ISAGO platform

Renewable electricity can support mining, processing, cable manufacturing and regional grid infrastructure.

The integrated development model

Partners & documents

No contracted project partners are currently published.

Approved reports will appear here

Public documents are published after review. Confidential project material is available only to authorized Workspace users.

Project updates

Verified development updates will appear here after approval.

Regional context

SOUTHERN AFRICA / DEVELOPMENT CONTEXTBOTSWANANAMIBIASOUTH AFRICAZAMBIAZIMBABWE
Botswana
Conceptual connections · Not asset coordinates

All development capacities are targets or scenarios, subject to technical and commercial development, permits and final investment decisions.